32/32 passed
Every calculator was executed from the values published in its production form. No default case produced a JavaScript exception or internal validation failure.
“Tested” should be inspectable. This release publishes what was executed, what passed, what was blocked by validation, and the exact limits of the internal QA claim.
Every calculator was executed from the values published in its production form. No default case produced a JavaScript exception or internal validation failure.
4,310 randomized cases were accepted and calculated; 490 contradictory cases were blocked by business-validation rules; 0 valid randomized case produced an exception or non-finite output.
Nine targeted regression checks were added for the October integrity patch, covering payment-plan term limits, church obligation gaps, zero-cost pricing, exact ties, repair values, cash-neutral states, zero discounts and zero collection gaps.
Every public HTML file was parsed; the one 404 document remains intentionally noindex.
Every sitemap URL resolves to a corresponding production file in the package.
Internal links, scripts, styles and image references were resolved with zero broken local targets.
All structured-data blocks parsed as valid JSON in the production package.
Scope: These are package-level checks on the October 5 Netlify release candidate. A live smoke test is still required after Netlify publishes the build.
This verification was performed internally on the production package. It does not certify the truth of a user’s business records, establish GAAP/IFRS compliance for a financial statement, or replace a CPA/ACCA/CIMA or licensed professional review.
| Check | Expected behavior | Result |
|---|---|---|
| Payment plan beyond 2,400 months | Report the actual principal term; never silently cap it | Pass |
| Church known obligation exceeds operating cash | Show the unfunded obligation and suppress misleading post-obligation runway | Pass |
| Minimum profitable price with zero loaded cost | Reject as an invalid profitable-margin base | Pass |
| Rent vs buy exact tie | Report equal estimated costs | Pass |
| Repair asset future value above current trade-in | Allow a separately estimated future value | Pass |
| Cash runway at exact break-even | Report cash-neutral, not cash-positive | Pass |
| Revenue-drop case at exact break-even | Report cash-neutral | Pass |
| 0% discount | Report no impact and low status | Pass |
| $0 cash gap | Do not recommend a collection target to close the gap | Pass |
Review public methodology and assumptions Review public methodology and assumptions Review public methodology and assumptions